top of page

General Contracting Projects

Lower Lake Spillway Repair

Removed existing deteriorated north spillway wall and replaced with reinfroced concrete wall faced with hnatural stone. Other aspects of work included reparinign the spillway nose wall, installing rock channel protection, weir wall and stop log repairs, and removing built up sediemnt from the north spillway.  

Holland Drive Ditch Improvement 

The Holland Drive Ditch Improvement project consisted of removing a failing timber wall along the north side of the ditch and constructing a boulder bank protection wall in its place. Other aspects of work included ditch clearing, tree/shrub removal and site resortation. 

bottom of page